General requirements
Compiled source label: current through Jun 30, 2022
Register checked through July 8, 2026/Vol. XLVIII, Issue 27 (2026-07-08) - no later Register activity found for this section
What LawEngine checked
- Status
- Source receipt
- Compiled source current through
- Jun 30, 2022
- Register checked through
- July 8, 2026/Vol. XLVIII, Issue 27 (2026-07-08)
- Register activity status
- no later Register activity found
- LawEngine source snapshot
- Jun 6, 2026
The permittee shall construct and operate the facility in accordance with the substantive provisions of the applicable local laws as identified in section 900-2.25 of this Part, except for those provisions of local laws that the office determined to be unreasonably burdensome, as stated in the siting permit.
The permittee shall construct and operate the facility in a manner that conforms to all applicable Federal and federally-delegated permits identified in section 900-2.26 of this Part. If relevant facility plans require modifications due to conditions of Federal permits, the final design drawings and all applicable compliance filings shall be revised accordingly and submitted for review and approval pursuant to section 900-11.1 of this Part.
The permittee shall coordinate with State, county, and local highway agencies to respond to and apply applicable traffic control measures to any locations that may experience any traffic flow or capacity issues.