Post-construction compliance filings

You’re browsing Title 19— the Department of State’s own regulations — free.

Create a free account (no card) to open all 23 titles →

Post-construction compliance filings

Compiled source label: current through Jun 30, 2022

Register checked through July 8, 2026/Vol. XLVIII, Issue 27 (2026-07-08) - no later Register activity found for this section

What LawEngine checked
Status
Source receipt
Compiled source current through
Jun 30, 2022
Register checked through
July 8, 2026/Vol. XLVIII, Issue 27 (2026-07-08)
Register activity status
no later Register activity found
LawEngine source snapshot
Jun 6, 2026
(a)Any updated information regarding the design, safety and testing for the wind turbines, solar panel, inverters, substation, transformer, and battery storage equipment to be installed during construction as well as information regarding the design, safety, and testing for any equipment installed during facility operation as a replacement of failed or outdated equipment shall be filed within 14 days of completion of all final post-construction restoration.
(b)As-built plans in both hard and electronic copies shall be filed within nine months of the commencement of commercial operations of the facility and shall include the following:
(1)GIS shapefiles showing all components of the facility (wind turbine locations, solar panel array locations, electrical collection system, substation, buildings, access roads, met towers, point of interconnection, etc.);
(2)collection circuit layout map; and
(3)details for all facility component crossings of, and co-located installations of facility components with, existing pipelines: showing cover, separation distances, any protection measures installed, and locations of such crossings and co-located installations.