Inspections during construction

You’re browsing Title 19— the Department of State’s own regulations — free.

Create a free account (no card) to open all 23 titles →

Inspections during construction

Compiled source label: current through Jun 30, 2022

Register checked through July 8, 2026/Vol. XLVIII, Issue 27 (2026-07-08) - no later Register activity found for this section

What LawEngine checked
Status
Source receipt
Compiled source current through
Jun 30, 2022
Register checked through
July 8, 2026/Vol. XLVIII, Issue 27 (2026-07-08)
Register activity status
no later Register activity found
LawEngine source snapshot
Jun 6, 2026
(a)Each construction-permitting agency shall provide for construction inspections of all work for which the agency has issued a construction permit under this Part. Work shall be inspected during the course of construction so as to observe the foundation, framing, superstructure, electrical system, plumbing system, heating/ventilating/air conditioning system, fire protection and detection system, and exit features.
(b)A construction-permitting agency may arrange for the inspections described in subdivision (a) of this section to be performed by a State agency managing construction of a project, by a design consultant, or by another party. Where the building, structure, or portion thereof which is the subject of a construction permit exceeds 20,000 cubic feet, a final inspection must be performed by the construction-permitting agency which issued the construction permit before a code compliance certificate may be issued.